BidHits® uses cookies to provide an individualized service and care for the privacy and protection of shared data.
By browsing this site, we understand that you agree to the terms of our Privacy Policy.
422 FSS RAF FAIRFORD CAFE - Please see - Attachment- 1- Sources Sought Notice. ; Attachement- 2- Statement of Works Modular Facility Attachement- 3- Statement of Requirements Concrete Pad; If you have any questions please contact the identified government po
Preconstruction engineering, design, site preparation, substructure installation, and utility servicing for a new single storey modular building to function as a community hub housing a library and café at RAF Fairford Feasibility report, 100% design package, topographical/boundary/level surveys, ground investigations, geotechnical report, soil sampling and WAC testing, buried services trace, utility mapping, CCTV drainage survey, structural substructure designs, pad foundation layouts, gravity fed drainage networks, earthworks, topsoil stripping, bulk excavations, geotextile separation membrane, granular subbase, mass concrete foundations, levelling piers, paving slab details, AC condenser unit base, perimeter skirting, foul/storm water drainage networks, UPVC pipework, inspection chambers, rodding eyes, gullies, utility service trenches, MDPE water supply pipe, electrical supply installation and commissioning, external landscaping reinstatement, grass seeding
AI helper
Sources sought notice for preconstruction engineering, design, site preparation, substructure installation, and utility servicing for a new modular building at RAF Fairford. Contractor must provide feasibility report, 100% design, firm price construction cost, manage site clearances, install pad foundation network, and deliver utility connections. Works include surveys, ground investigations, earthworks, foundations, drainage, water and electrical infrastructure, and landscaping. Contractor accepts design liability. UK and US standards apply. Base security clearance required 6 months in advance. Working hours Monday-Friday **** survey required. RAMS submitted 1 week prior. O&M manuals and as-built drawings in AutoCAD required.
Compliance of all equipment and systems installed is required during the first 12 months of the warranty period from date of handover, including all planned preventative maintenance tasks. compliance of all equipment and systems installed as part of the project, during the first 12 months of the warranty period from date of handover
All mechanical and electrical works must be carried out by RAF Fairford approved engineers with a valid skilled person certificate. all mechanical and electrical me works must be carried out by raf fairford approved engineers with a valid skilled person certificate issued by the relevant ap authorised person for raf fairford
Delays or costs incurred by failure to comply with base entry requirements, including failure to provide adequate personal identification or use of prohibited items, will be borne by the contractor. Any delays or costs incurred by failure to comply with base entry requirements, including but not limited to failure to provide adequate personal identification, use or conveyancing of prohibited items weapons, illicit drugs, alcohol will be borne by the contractor
422 FSS RAF FAIRFORD CAFE - Please see - Attachment- 1- Sources Sought Notice. ; Attachement- 2- Statement of Works Modular Facility Attachement- 3- Statement of Requirements Concrete Pad; If you have any questions please contact the identified government po
Preconstruction engineering, design, site preparation, substructure installation, and utility servicing for a new single storey modular building to function as a community hub housing a library and café at RAF Fairford Feasibility report, 100% design and firm price construction cost, topographical/boundary/level surveys, ground investigations, geotechnical report, soil sampling and WAC testing, buried services trace, utility mapping, CCTV drainage survey, structural substructure designs, pad foundation layouts, gravity fed drainage networks, earthworks, subbase engineering, geotextile separation membrane, granular subbase, mass concrete foundations, levelling piers, paving slab details, AC condenser unit base, perimeter skirting, foul/storm water drainage networks, UPVC pipework, inspection chambers, rodding eyes, gullies, gravity connections, air pressure testing, utility service trenches, sand blinding, utility ducts, MDPE water supply pipe, water chlorination/flushing/pressure testing, electrical supp
AI helper
Sources Sought Notice for preconstruction engineering, design, site preparation, substructure installation, and utility servicing for a new single storey modular building at RAF Fairford, UK. The building will serve as a community hub with library and café. Work includes surveys, ground investigations, earthworks, foundations, drainage, utilities, and landscaping. Contractor must provide firm fixed price construction cost. Base security clearance required 6 months in advance. UK and US standards apply. Working hours Monday-Friday **** survey required. Design submissions require 2-week review period.
Roof replacement project for roof sections 2- 5 at Coastal Empire Montessori Charter School Roof sections 2, 3, 4, and 5; tear off of existing roofing materials; deck and insulation preparation; installation of new insulation and membrane roofing; flashing; drainage; skylights; related components
AI helper
Furnish and install all materials, labor, and services to remove and replace existing roofing systems on roof sections 2, 3, 4, and 5 at Coastal Empire Montessori Charter School. Work includes tear off of existing roofing, deck and insulation preparation, new insulation and membrane roofing, flashing, drainage, skylights, and related components.
Removal of existing roofing assemblies and complete installation of approximately 42, 000 sf of single- ply roof membrane, including new insulation and decking at Johnstone Complex, Montana State University Removal of existing roofing assemblies, installation of single- ply roof membrane, new insulation, decking, moisture barrier, drainage installation, EPS board attachment, fiberglass mesh embedded in base coat, water- resistant coat, finish coat
AI helper
Roof replacement project at Johnstone Complex, MSU Bozeman, including removal of existing roofing and installation of single-ply membrane, insulation, and decking. Work in one phase, regular hours, coordination with MSU required. Contractor responsible for safety, staging, and site access. Submittals required, including schedule of values, construction schedule, and samples. Substitution requests considered.
Roof Assessment and Repair at the Albuquerque Area Indian Health Service Healthcare Facilities - The Indian Health Service ( IHS), the Albuquerque Area Indian Health Service ( AAIHS) has a requirement for roof assessment and repair services. This is a combined synopsis/solicitation for commercial products or commercial serv
Roof assessment and repair services for Albuquerque Area Indian Health Service healthcare facilities Roof assessment and leak repairs for the AIDC building, ASU buildings, and MSU buildings
AI helper
Combined synopsis/solicitation for roof assessment and repair services at multiple IHS facilities in Albuquerque and Mescalero, NM. Set aside for Indian Small Business Economic Enterprises (ISBEE) with cascading set-aside. Firm-fixed-price order. Quotes due December 4, 2026, 3:00 PM MST. Site visits encouraged, must be completed by November 30, 2026. Minimum 5 years commercial roofing experience preferred. One-year warranty required. Invoices via IPP. Davis-Bacon wage determinations apply.
Quotes must be submitted by December 4, 2026, by 3:00 PM MST. The solicitation states: submit their quotes by december 4, 2026, by 3:00 pm ms.
Payment will be made for services performed and accepted, based on unit prices quoted. Invoices must be submitted via IPP. The document states: upload complete invoice with all required documentation to: https:www. ipp. gov.
A minimum one-year warranty on all parts and labor is required. The document states: provide minimum all inclusive, one 1 year warranty on all parts and labor.
Best value tradeoff evaluation. The document states: award will be made to the responsible quoter whose quotation conforming to the solicitation is determined to be most advantageous to the government, price and other factors considered.
Minimum 5 years of experience in commercial roofing preferred. The document states: minimum 5 years of experience in commercial roofing preferred and demonstrated experience with healthcare facilities preferred.
Failure to implement corrective actions may result in termination for cause. The document states: failure to implement corrective actions may result in termination for cause.
Site visits are encouraged and can be scheduled by contacting Karen Gavin or Ana Cruz. The document states: interested offerors are encouraged to complete a site visit of the facilities.
Questions must be submitted by Friday, November 20, 2026, at 12 PM MST. The document states: submit questions concerning this solicitation by friday, november 20, 2026, at 12 pm ms.
Failure to comply with terms and conditions may result in the offer being determined non-responsive. The document states: failure to comply with the below terms and conditions may result in offer being determined as non responsive.
We selected the most helpful reviews from real users. Order may change periodically.
It encompasses all portals in one place.
G. Ferrea
Smart search helped discover bids I hadn't even imagined receiving notifications for.
M. F. Cortez
Good information. All the information is very good!
J. A. Tellez
Everything is perfect. They are a great help in finding bids relevant to our field of work. I really appreciate that the bids are sent directly to my email; it’s a huge help in identifying where I can contribute and what I can do.
Oto
Very good and accurate information about the tenders: consistent and precise.
G. R. Ortiz
The idea of ​​using a keyword and sending the information by email is very good.
U. Solutions
I consistently received notifications about bids within the specific segment I chose to monitor. The system simplifies processes that used to be complex, offering a navigation experience that is easy, fast, and modern.
G. P. da S. E. Guimaraes
The tool is truly effective at scanning bid documents, efficiently delivering bids.
G. D. Reis
Efficiency in search times.
R. Chavez
You see a lot of tenders; you get emails with the alerts.
M. Camarasa
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
R. M. Ferreira
It is complete and optimal, it improves my time.
R. de L. Cruz
I like the way they provide information with the greatest possible accuracy. I love that.
Filter bids, save promising opportunities and ask questions about solicitation documents.
Filters and map
Filter by location, procurement type and value. View opportunities on the map to decide what deserves a closer look.
Favorites and notes
Save the bids that interest you and add private notes, so you can return to your review later.
Solicitation document assistant
Ask questions about documents the system can read. Check the answers against the solicitation documents and the official source.
Frequently asked questions
It is a government bid search service for the United States. Find opportunities related to what your business supplies, keep separate searches organized and receive email alerts.
Start with your email. Then add specific products or services and the locations you want to search. Your first monitoring group is created automatically, so you can get started without setting everything up.
No credit card is required and there are no automatic charges. Try the service for 14 days and choose a paid plan only if you decide to continue.
As soon as you save what you supply and your preferred locations, you can see matching bids on the site. Start with that list and explore filters and other tools at your own pace.
Official portals remain the source for solicitation documents and requirements. BidHits combines smart search, state filters, groups and alerts to help you spend less time sorting through notices. Try it with your own products and compare it with your current bid research.
They are separate searches for different parts of your business. You could have one called Well-equipped workplaces and another called Growing in Texas, each with its own products, services and locations. You choose the names. The number of groups depends on your trial or plan.
Every plan includes email alerts. The Essential plan sends alerts directly to your main email. The Professional and Advanced plans let you group email addresses into lists, such as Sales and Purchasing, then choose which list receives alerts from each monitoring group. Groups define what to track; lists define who receives it. Several groups can use the same list. List and additional email limits apply to the whole plan, not separately to each group or list.
Alerts send matching bids to your registered email according to the schedule available in your trial or plan. You can adjust email settings. Results appear on the site after you save your products and locations; emails follow the sending schedule. Where several daily sending times are available, the schedule applies across all groups and lists.
Use specific product or service names, such as office chairs. Smart search helps connect your offer with other descriptions, such as pest control and insect and rodent management. AI can make mistakes: check whether each opportunity is relevant and adjust your search terms when needed.
Filter by location, procurement type, dates and values, view opportunities on the map and save relevant bids as favorites. Add private notes so you can pick up your review later.
Yes. The AI assistant answers questions about documents the system can read, within the question limit for your trial or plan. It supports your review; check the answers against the solicitation documents and the official source.
Look for the document or official notice link in the opportunity. If the source portal requires a login or restricts direct access, you may need to open the procurement page and download the documents there.
If you do not choose a paid plan, the bid list becomes limited. Nothing is charged automatically. You decide whether to subscribe and continue with the features of your chosen plan.
Human support is available for questions about access, searches, monitoring groups and settings. Start with the basics and explore other tools at your own pace.
Yes. The API is included in the Professional and Advanced plans, with one key per account and a separate API request allowance shared across its sessions. See the API documentation.
Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.
Transcript
Welcome to BidHits.
Finding public tenders and bids is important. But what really matters is quickly identifying the opportunities that match what your company sells.
To get started, enter a few keywords that describe your products or services. BidHits shows relevant opportunities, highlights your keywords, and organizes everything by date.
Smart search is already enabled and uses artificial intelligence to expand your results, even when the tender uses different words from the ones you searched for.
For each opportunity, you can view a summary, access documents, mark it as a favorite, add private notes, remove what is not relevant, or view it on the map.
You can also use filters, run searches, and explore the day's opportunities directly on the map.
Start using BidHits now. It's fast, practical, and you can try it for free.
AI Assistant
Ask me about the bid...
Loading summary...
Methodology
Unaided survey with 1119 active users, conducted through 11/13/2026.
Single question: "Would you recommend our services to a friend or colleague?" - 90% answered "yes".