Dept Of Defense- Dept Of The Army- W2Sr Tf Vipr
Natural Gas Pipeline Construction/ Pipeline Installation/ Pipeline Welding/ Pipeline Testing/ Oil And Gas Pipeline/ Oil And Gas Pipeline Construction
Freedom Connection Natural Gas Pipeline - ********************************************************************************** This amendment is to update the response date to 10: 00 AM ( AST) Thursday, 8 October 2026. **********************************************************
Construction of the Freedom Connection natural gas pipeline in Puerto Rico 4. 2 mile, 20- inch diameter natural gas pipeline; mainline block valve stations; pig launcher/receiver stations; electrical and instrumentation; protective external coatings; hydrostatic pressure testing; leak detection; commissioning; restoration and handover
Bid Close Date: