City Of Bellevue - WA
Pressure Reducing Valve Station/ Pipeline Installation
PRV Replacements 2026 Phase 1 PRV 108 Work contemplated to be performed under this contract is as follows: & bull Installing 1 new Pressure Reducing Valve Station, including vault and appurtenances & bull Constructing approximately 60 LF of ductile iron water mains, & bull Excavation dewatering, & bull Excavation shoring, & bull Relocating existing utilities ( as required), & bull Restoring surface conditions, including asphalt trench patching and concrete sidewalks, & bull Performing traffic control, & bul
PRV replacements 2026 phase 1 PRV 108 - installation of a new pressure reducing valve station and related water main construction Installation of 1 new pressure reducing valve station including vault and appurtenances, constructing approximately 60 LF of ductile iron water mains, excavation dewatering, excavation shoring, relocating existing utilities as required, restoring surface conditions including asphalt trench patching and concrete sidewalks, performing traffic control, other work as required to complete the project
Bid Close Date: