U3P - Utah Public Procurement Place - UT
Sewer Connection Work
**** South Mountain View Corridor Sewer Project - Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project. This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR 85 ( Mountain View Corridor) within UDOT Region 2 right of way. The Work includes, but is not limited to, installation of 10- inch and 18 inch PVC gravity sanitary sewer pipe; trenchless installation of a 36 inch diameter steel
**** South Mountain View Corridor Sewer Project Installation of 10- inch and 18- inch PVC gravity sanitary sewer pipe, trenchless installation of 36- inch diameter steel casing with carrier pipe beneath SR 85, excavation and backfilling of launch/retrieval/intermediate shafts, installation of 60- inch diameter lined sanitary sewer manholes, connection to existing sanitary sewer system, abandonment and removal of existing sewer infrastructure, surface restoration including pavement/curb/gutter/sidewalk/striping, traffic control within UDOT right- of- way, sanitary sewer bypass pumping, related appurtenances and incidental work
Bid Close Date: