City Of Sheridan - WY
Curb And Gutter
The Hub on Smith Upward Project Phase V - Site Improvements - The Base Bid consists of site and exterior building improvements for The Hub on Smith, 211 Smith Street, Sheridan, Wyoming. Work generally includes demolition of existing pavement, sidewalks, curbs, stairs, ramps, retaining walls, railings, equipment enclosures, landscaping, utilities, and selected exterior wall materials; construction of new concrete parking lots, access drives, sidewalks, curb and gutter, accessible parking areas, raised crossw
Site and exterior building improvements Demolition of existing pavement, sidewalks, curbs, stairs, ramps, retaining walls, railings, equipment enclosures, landscaping, utilities, and selected exterior wall materials; construction of new concrete parking lots, access drives, sidewalks, curb and gutter, accessible parking areas, raised crosswalks, equipment pads, stairs, and related site features; grading, storm drainage, water, sanitary sewer, grease interceptor, electrical, site lighting, landscaping, irrigation, signage, and pavement marking improvements; exterior building work including removal and replacement of selected brick veneer, metal siding, insulation, weather barriers, flashing, and trim; foundation wall waterproofing and drainage; mat installation; removal and reinstallation of storefront windows, coping, artwork, signage, and interior window finishes; repairs and insulation at existing wall and floor framing; and construction of concrete mechanical pads with an aluminum screen wall and gates.
Bid Close Date: