Homeland Security, Department Of- U. S. Coast Guard- Sflc Procurement Branch 2( 00085)
Hydrostatic Testing/ Pressure Relief Valve Service/ Hydrostatic Testing Services
USCGC Healy Relief Valves Overhaul - STATEMENT OF WORK ( SOW) Vessel: USCGC HEALY ( WAGB 20) Project: Relief Valves Overhaul 1. 0 SCOPE Requirements for the inspection, overhaul, and testing of two ( 2) relief valves, Part Number: S8LJE- 02RF1- 03RF1- SS- H2- TB,
Relief valves overhaul for USCG Cutter Healy ( WAGB 20) Inspection, overhaul, and testing of two ( 2) relief valves, part number: s8lje- 02rf1- 03rf1- ss- h2- tb; disassembly and cleaning; visual and dimensional inspection of hard parts; replacement of all soft goods ( O- rings, gaskets, packing, seals); machining or lapping seating surfaces; reassembly per OEM specifications; hydrostatic shell testing and seat leakage testing; calibration and pop testing; metallic calibration tag; condition found report ( CFR); certified test report
Bid Close Date: