Repair of 2 hydraulic servovalves (NSN ****, P/N ****) for the US Navy. Induction period 365 days from award, extendable by 365 days. Option pricing for up to 50 units. Award based on lowest price technically acceptable. First article testing required unless waived. Contractor responsible for all parts, materials, and tooling. Quality system per ISO 9001/AS9100. DCMA oversight. Beyond economical repair threshold at 75% of replacement price. Missing on induction provisions apply.
The induction period for initial units is 365 calendar days from contract award, with possible extension of 365 days. the induction period for the initial units in this order is 365 calendar days from the date of contract award.
Payment will be processed through Wide Area Workflow. wide area workflow payment instructions and invoice and receiving report combo are referenced in the solicitation.
Warranty of supplies of a noncomplex nature applies for 365 days from last delivery. warranty of supplies of a noncomplex nature jun **** 6 365 days 45 days of the last delivery under this contract
Lowest price technically acceptable. this requirement will be awarded to the offeror with the lowest price technically acceptable lpta quote.
Contractor must maintain quality system per ISO ****/SAE **** and calibration system per ANSI/NCSL Z540. 3. the contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of iso **** sae ****.
If first article is disapproved, contractor bears all costs for retesting. all costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval.
First article samples are required for testing. the contractor shall present 1 unit s of the following cage ****, part number **** 1, revision latest as specified in this contract.
Failure to present first article on time or disapproval results in default. if the contractor fails to present any first article on time, or the contracting officer disapproves any first article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause.