University Of Colorado Design And Construction
Design
Summer 2027 Maintenance **** C4C Building Lighting Controls Upgrade 2026- PM- Eddie Eisiminger- Project will focus on replacing the two existing lighting controls systems with one unified N- Lite System for the whole **** WVC Flooring Repair 2027 - PM- Eddie Eisiminger- Project will focus on concrete flooring refinishing, 2 exterior picnic tables install, solid surface install on UPS Store hallway walls, and general paint/patch in the conference wing of **** STNW Exterior Patio Addit
Design- bid- build general contractor services for University of Colorado Boulder summer 2027 maintenance and infrastructure improvement projects **** C4C building lighting controls upgrade 2026; **** WVC flooring repair 2027; **** STNW exterior patio addition 2027; UCB00XXXX Code exterior camera installation 2026; **** CKRL, CROS, Reed maintenance 2027; **** NTCT 2E, 2F, 2G, 2H exterior balcony removal 2027; **** MRCTG MRCTJ exterior walkways 2027; **** STNE maintenance 2027; **** STNW maintenance 2027; **** SWLL maintenance 2027
Bid Close Date: