Sealed bids for court repair, color coating, and striping at multiple park locations. Bid opening January 20, **** at 10:00 a. m. Work includes acrylic resurfacing, patching, and line painting. Bid guarantee of 5% required. Performance and payment bonds at 100% of contract price. Prevailing wages apply. Substantial completion by June 26, ****. Contact Gary Buczkowski at **** for site access.
Substantial completion is required by June 26, ****. The contract states: substantial completion date: june 26, ****.
Monthly estimates may be presented, with payments made within approximately 30 days after review. The document states: payments will be made within approximately thirty 30 days after review by the owner.
A minimum one-year warranty is required for all materials and workmanship. The document states: the contractor andor manufacturer shall provide a minimum of one 1 year warranty for all materials and workmanship.
The contract will be awarded to the lowest responsible bidder. The document states: award of contract will be made to the lowest responsible bidder.
Bidders must examine all documents and visit the site. The document states: each bidder shall carefully examine all documents pertaining to the work and visit the site to verify conditions.
Failure to provide required bonds within 5 days may constitute default. The document states: the failure of the successful bidder to supply the required bonds within five 5 days after the notice of award. . . shall constitute a default.
Bidders are encouraged to visit sites, and access can be arranged. The letter states: please call me to schedule a time when i can get you access to the sites.
Bids submitted after the closing time will be returned unopened. The document states: bids submitted after the closing time will be returned unopened.