Repair and modification of flight processor (NSN ****, P/N ****) for the US Navy. Limited source procurement with LPTA award. Contractor responsible for all repair, testing, inspection, and quality control per ISO 9001/AS9100. Must provide facility, labor, materials, and test equipment. 365-day induction period from award, extendable by 365 days. Option pricing for up to 30 units. Quotes due by closing date on page 1 of solicitation, submitted via email to linda. vong2. civ@us. navy. mil. Warranty: 365 days from last delivery. Government may select samples for repair assessment testing.
The induction period for initial units is 365 calendar days from contract award, with possible extension of 365 days. The contract states: the induction period for the initial units in this order is 365 calendar days from the date of contract award.
Payment will be processed through Wide Area Workflow (WAWF). The document references wide area workflow payment instructions and invoice and receiving report combo.
Warranty applies for 365 days from the last delivery under the contract. The document states: warranty of supplies of a noncomplex nature jun **** 6 365 days 45 days of the last delivery under this contract.
The award will be based on lowest price technically acceptable (LPTA). The document states: this requirement will be awarded to the offeror with the lowest price technically acceptable lpta quote.
Contractor must maintain a quality system meeting ISO ****/AS9100 requirements. The document states: the contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of iso **** sae ****.
The government may select samples for testing. The document states: the government may select samples of the contract line items clins which have completed repair and have been accepted by the government representative for the purpose of conducting performance testing.
Repairs performed using unapproved changes are at contractor's risk. The document states: any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractors own risk.