The City Of Oklahoma City And Trusts
Sanitary Sewer Installation Prequalification Requirement is Wastewater pipeline contractor & ldquo; C& rdquo; OCWUT SC- ****, Sanitary Sewer Installation, Along Exchange Avenue from Westwood Boulevard to South Indiana Avenue
Sanitary sewer installation Sanitary sewer installation along Exchange Avenue from Westwood Boulevard to South Indiana Avenue
Bid Close Date:
Lot 1: Color audio/video recording, pre & post construction
Lot 2: Clearing and grubbing
Lot 3: Trench excavation and backfill - 0 to 10 feet
Lot 4: ( rcp) storm sewer ( 30 inch) " o" ring
Lot 5: Design 2- 4 inlet complete in place
Lot 6: ( 6 inch) ( pvc) waterline pipe ( push- on joint) ( dr- 14)
Lot 7: Fittings ( 6 inch x 45 degree bend)
Lot 8: Fittings ( 6 inch solid sleeve)
Lot 9: Sanitary sewer pipe ( 8 inch) ( sdr- 26)
Lot 10: Sewer service connction
Lot 11: Sewer service line
Lot 12: Sewer flow control
Lot 13: Deflection test (
Lot 14: Television inspection ( cctv) ( pre const. )
Lot 15: Television inspection ( cctv) ( post const. )
Lot 16: Sewer leakage test (
Lot 17: ( 4 foot dia. ) sanitary sewer manhole ( 0- 6 feet)
Lot 18: Extra depth manhole wall ( 4 foot dia. )
Lot 19: Manhole testing (
Lot 20: Sanitary sewer manhole rehabilitation ( 4 foot dia. )
Lot 21: Setting new manhole ring and cover
Lot 22: Removing manhole ( 4 foot)
Lot 23: Bore and steel encasement ( 8 inch carrier) ( excluding sewer)
Lot 24: Construction staking ( construction survey)
Lot 25: Gps " as- built" survey
Lot 26: Construction signing & traffic control
Lot 27: Mobilization
Lot 28: Structure removal ( design 2- 4 inlet)
Lot 29: Pavement cut and permanent repair ( asphalt)
Lot 30: Remove and replace sidewalk ( 4 inch)
Lot 31: Remove and replace driveway ( 6 inch)
Lot 32: Remove and replace curb ramp ( 8 inch)
Lot 33: Remove and replace tactile warning device
Lot 34: Remove and replace curb & gutter ( 6 inch barrier)
Lot 35: Integral curb ( 6 inch barrier)
Lot 36: Temporary erosion control
Lot 37: Solid slab sodding