Dept Of Defense- Dept Of The Army- Usace- Pod- W2Sn Endist Japan
Fuel Storage Tank/ Bulk Storage/ Vertical Turbine Pump/ Storage Tank Construction
**** - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan - Update 10 September 2026: Attached Pre- Proposal Conference Slides. Project Title: **** - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100, 000- barrel cut- and- cover JP- 8 storage tank. A
Bulk fuel storage tank construction Construct one 100, 000- barrel cut- and- cover JP- 8 storage tank, including a pump house with four 600 gpm issue vertical turbine pumps and one 50 gpm water draw- off vertical turbine pump. The tank will include a high level valve, independent level alarms, and hardware for an automatic tank gauging ( ATG) system. It also includes piping, valves, vaults, and appurtenances connecting to an existing filter separator building, a product saver tank, and a reinforced concrete pump house.
Bid Close Date: