Effingham County Board Of Commissioners
OPEN Effingham County Regional Water Supply Facilities 1. 5 MG Elevated Water Tank
Construction of a 1. 5 million gallon concrete composite elevated water tank as part of the regional water supply facilities project Elevated water tank and foundation, site clearing and grading, gravel access areas, 12 inch PVC water main, flanged piping and control valves, connection to existing 16 inch water main, fire hydrant assemblies, gate valves, steel casing jack and bore work, chain link fencing and gates, rip rap, miscellaneous concrete, erosion and sediment controls, site restoration, electrical service, panels, conduit, wiring, gauges, controls, grounding, lighting, pressure instrumentation, SCADA equipment, tank lighting, obstruction lighting provisions, tank coating and painting, lettering and logo installation, disinfection and bacteriological testing, stormwater NPDEs monitoring and reporting
Bid Close Date: