Dept Of Defense- Dept Of The Army- Usace- Pod- W2Sn Endist Japan
**** - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan - Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026
bulk fuel storage tanks construction of one 100, 000 barrel JP- 8 storage tank with pump house, four 600 gpm vertical turbine pumps, one 50 gpm water draw- off pump, high level valve, level alarms, automatic tank gauging system, piping, valves, vaults, product saver tank, product recovery pump, steel tank with concrete outer wall, reinforced concrete pump house, low slope concrete roof, built- up roofing, rolling cover, control system integration with existing filter building PLC and HMI
Bid Close Date: