Dept Of Defense- Dept Of The Army- Usace- Spd- W075 Endist Los Angeles
Rio De Flag - Phase 4 Construction - SOLICITATION ****: RIO DE FLAG FLOOD CONTROL PROJECT - PHASE 4 CONSTRUCTION ( LOWER RDF INLET) PRODUCT SERVICE CODE ( PSC): Y1KB - CONSTRUCTION OF CANALSISSUING ACTIVITY: U. S. Army Corps of Engineers ( USACE), Los Angeles District ( SPL) 1. GENE
Construction of Phase 4 Lower RDF Inlet of the Rio de Flag Flood Control Project Reinforced concrete box culverts, riprap lined earthen trapezoidal channel, grouted stone channel, reinforced concrete transition structures, rectangular concrete channel, concrete wingwalls, drop inlets, junction structures, side drainage connections, outlet headwalls, mass soil excavation, soft rock excavation, hard basalt rock excavation, controlled blasting, real- time geotechnical monitoring, relocation of BNSF signal bungalow, environmental remediation of petroleum contaminated soils, removal of underground storage tanks, surface water diversion, groundwater dewatering, utility relocations, street restoration, traffic control, security fencing, automated irrigation systems, exterior plantings, 12- month plant establishment period
Bid Close Date: