Engineering Ventures, Pc - VT
Shady Pines MHP - Improvements to Water Syatem - A. The project proposes the following work to the water system: Replacement of the existing 40+ years old 6, 000 gallon steel pressure storage tank with 2: 4, 000 gallon buried fiberglass storage tanks. Construction of a new 95 GPM dual- alternating self- priming booster pump system to pressurize the mobile home park distribution system. The existing 6, 000 gallon steel pressure tank is pressurized by the 30 gpm well pump. Construction of a 45 ft extension on
Water system improvements Replacement of existing 6, 000 gallon steel pressure storage tank with two 4, 000 gallon buried fiberglass storage tanks. Construction of a new 95 gpm dual- alternating self- priming booster pump system. Construction of a 45 ft extension on the 1. 5 PVC well supply line. Construction of 30 ft of 3 PVC suction line. Replacement of 1, 300 ft of existing water mains with a 3 in HDPE water main. Construction of a flushing hydrant. Replacement of 525 ft of water services with 3/4 in HDPE water pipe and individual shutoff valves.
Bid Close Date: