State, Department Of- State, Department Of- U. S. Embassy Asuncion
Solicitation # **** - ECAC Storm Drainage rebuild - Description of Proposed Work: Post is proposing to rebuild a former drainage structure in front of the south side of ECAC, connecting it to an existing drainage manhole for the Mcal Lopez Avenue RSSI Barrier. The existing manhole
maint/repair/rebuild of equipment- construction and building materials maintenance, repair and rebuilding of equipment: construction and building materials description of proposed work: post is proposing to rebuild a former drainage structure in front of the south side of ecac, connecting it to an existing drainage manhole for the mcal lopez avenue rssi barrier. the existing manhole is equipped with two 2hp electric pumps that will help to quickly remove the water to the avenue.
Bid Close Date: