North Harris County Regional Water Authority
NHCRWA Project 31F Proposed 48- inch, 24- inch, and 12- inch Water Line from Huffmeister Road to Grant Road Scope of Work for the NHCRWA Project 31F consists of the installation of 48- inch water line, 24- inch and 12- inch water line through a combination of open cut, tunneling construction methods, and Horizontal Directional Drill ( HDD) methods, including valves, connections, and appurtenances. The project is constructed from Huffmeister Road to Grant Road through both residential and Harris County Flood
NHCRWA Project 31F proposed 48- inch, 24- inch, and 12- inch water line from Huffmeister Road to Grant Road
Bid Close Date: