Spicer Group - Saginaw - Riverfront
Saginaw Street Sidewalk Replacement- The Project consists of constructing: Replacement of concrete sidewalk and both sides of S Saginaw Street from Belle Ave to Clinton St. 230 Ft. Curb and Gutter, Rem 780 Syd. Sidewalk, Rem 26 Cyd. Subgrade Undercutting, Type II 2 Each. Erosion Control, Filter bag 30 Ton. Aggregate base, Modified 50 Syd. HMA Surface, Rem 12 Ton. Hand Patching 20 Syd. Driveway, Nonreinf Conc, 6 inch 160 Ft. Curb and Gutter, Conc, Det F4 40 Ft. Detectable Warning Surface 80 Ft. Curb Ramp Ope
Bid Close Date: