Town Of Hot Springs
US25/70 BRIDGE WATERLINE REPLACEMENT- THE PROJECT GENERALLY CONSISTS OF: The installation of approximately 500 LF of 10 HDPE and 450 LF of 8 DIP water line, with all necessary accessories and appurtenances.
Bid Close Date:
AI email alerts, regional filters, and access to bid documents
US25/70 BRIDGE WATERLINE REPLACEMENT- THE PROJECT GENERALLY CONSISTS OF: The installation of approximately 500 LF of 10 HDPE and 450 LF of 8 DIP water line, with all necessary accessories and appurtenances.
Bid Close Date:
Wastewater Treatment Plant Upgrade- The proposed project generally includes the conversion of the outer ring of the existing aeration basin treatment tank to a flow equalization basin and influent pump station; conversion of existing clarifier to sludge storage, installation of two ( 2) non- potable water pumps; installation of three ( 3) owner furnished 12, 000 gallon sludge storage tanks and one ( 1) owner furnished 8, 500 gallon sludge storage tank; Installation of two ( 2) owner furnished sludge pumps a
Bid Close Date:
Wastewater Treatment Plant Upgrade- The proposed project generally includes the conversion of the outer ring of the existing aeration basin treatment tank to a flow equalization basin and influent pump station; conversion of existing clarifier to sludge storage, installation of two ( 2) non- potable water pumps; installation of three ( 3) owner furnished 12, 000 gallon sludge storage tanks and one ( 1) owner furnished 8, 500 gallon sludge storage tank; Installation of two ( 2) owner furnished sludge pumps a
Bid Close Date:
Wastewater Treatment Package Plants- THE PROJECT GENERALLY CONSISTS OF: The equipment supplier shall provide two complete self- contained, fully transportable integrated assembled package type treatment units with a minimum average daily flow of 75, 000 gallons per day ( gpd) and peak hydraulic capacity of 150, 000 gpd. The total average daily design capacity for the system shall be 150, 000 gpd. Treatment units and proposed equipment shall provide fine screening for influent wastewater and equipment and pr
Bid Close Date:
Wastewater Treatment Package Plants- THE PROJECT GENERALLY CONSISTS OF: The equipment supplier shall provide two complete self- contained, fully transportable integrated assembled package type treatment units with a minimum average daily flow of 75, 000 gallons per day ( gpd) and peak hydraulic capacity of 150, 000 gpd. The total average daily design capacity for the system shall be 150, 000 gpd. Treatment units and proposed equipment shall provide fine screening for influent wastewater and equipment and pr
Bid Close Date:
Expands your search so you don't miss relevant opportunities.
Get opportunities by email; open bid documents or the official posting; view them on the map.
Filter by region, method, and value; favorite items and add notes to organize opportunities.
Add words related to your products or services. Our AI broadens the search so you don't miss opportunities.
Start the 14-day free trial and receive alerts with links to bid documents or the official posting.
Add or edit keywords, set regions, choose your email delivery schedule and email style. Map view available in the dashboard.
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
It helps me identify areas of opportunity and find bids related to my work area.
A complete, easy-to-use system. Support from calm, patient, and clear-teaching professionals.
The search engine that finds what I'm looking for just by entering keywords
It is complete and optimal, it improves my time.
I quickly find the bids that interest me.
It's an extremely useful tool.
Great recommendations appear. Having the bid process link right in the email body helps a lot and saves time.
The information helps me submit my bids on time for bids, and I also have readily available information on upcoming bids. So far, I am very satisfied with what I have received.
I don’t look for tenders—they find me!
Efficiency in search times.
The search tool really works and satisfactorily meets our needs.
Explore a term, enable AI email alerts, access bid documents or the official posting, and filter by region and method.