City Of Rosenebrg
Rosenberg CDBG- MIT Flood and Drainage Mitigation Project Activity 6 - Theater Ditch North Channel Improvements Grading the existing channel side slopes and flow line as shown on the plans to reduce flow line ponding and increase slope stability. Trench excavation and backfill for all utility installation of water lines using trench box methods as specified. Remove and replace existing water lines as shown and specified.
rosenberg cdbg mit flood and drainage mitigation project activity 6 theater ditch north channel improvements grading the existing channel side slopes and flow line as shown on the plans to reduce flow line ponding and increase slope stability. trench excavation and backfill for all utility installation of water lines using trench box methods as specified. remove and replace existing water lines as shown and specified.
Bid Close Date: