Village Of Tequesta - FL
Public Services Facility Column Restoration - This project consists of the repair and rehabilitation of the existing steel framing system, including structural steel wall girts, steel columns, and associated base plates and anchor bolts. Complete Priority Level 1 items. Owner may elect to proceed with Priority Level 2 items. Priority Level 1 items consist of columns with greater than 20% section loss or voids in the steel resulting in a structural steel repair. Priority Level 2 items consist of columns limi
Public Services Facility Column Restoration Repair and rehabilitation of existing steel framing system, including structural steel wall girts, steel columns, and associated base plates and anchor bolts. Priority Level 1 items ( columns with greater than 20% section loss or voids). Owner may elect to proceed with Priority Level 2 items ( columns limited to cleaning steel corrosion and coating).
Bid Close Date: