Fort Cobb Reservoir Master Conservancy District ( Fcrmd)
**** - Replacement of Fort Cobb Dam Outlet Works 24inch Sleeve Valve Description of Work: The Fort Cobb Reservoir Sleeve Valve Replacement Project involves the removal andreplacement of a 24- inch vertical submerged sleeve valve located inside a stilling well at theoutlet works of the dam. The existing valve has reached the end of its service life, withstructural degradation observed in both the valve body and surrounding grout. 1. Valve Replacement: Remove and replace the existing 24- inch sleeve valve
replacement of fort cobb dam outlet works 24inch sleeve valve 1. valve replacement: remove and replace the existing 24 inch sleeve valve, includingsurrounding grout at supporting base. 2. actuation improvements: install a new eim actuator on the replacement valve to alignwith system standardization. 3. electrical improvements: install new duct bank conduit between the control room andthe valve and other related improvements. 4. structure improvements: remove and replace the existing structure covering thesleeve valve.
Bid Close Date: