County Of Burke - GA
Soccer Complex Irrigation
soccer complex irrigation rfp request option 1: red lines in diagram 2 irrigation controller to be compatible with the hunter ez system, and control valves to be installed with hunter ez decoders. mount irrigation controller to electrical panels install a 2 gate valve box to connect to the well line. 2 line across soccer fields connect 2 pgv hunter control valve with 2 mainline install hunter i25 sports turf heads sports turf heads to be spaced 50ft apart, installed with a light green nozzle o 2 mainline 1, 100ft o 2 lateral line 1, 600ft o 1. 5 lateral line 960ft o 1 lateral line 800ft all piping is class 200 pipe, and fittings are to be schedule 40 fittings. option 2: blue lines in diagram 2 connect 3 piping to the well 65gpm. run 3 piping under the road to the main to the irrigation controller with the 2 gate valve. blue line on diagram 2 o 3 mainline 700ft fill the roadway with gab where it is cut to install the irrigation sleevesee diagram 2 for more details.