Aqua Water Supply Corporation ( Aqua Wsc)
AQUA WSC L Improvements Project The Project includes the following Work, but is not limited to, construction of the following: Installation of a raw water meter vault, a 0. 5 MG prestressed concrete ground storage tank ( GST), 1, 500 gpm forced draft aeration ( FDA) tower, a gas chlorine feed system and storage building, 1, 500 gpm booster pump station, electrical instrumentation and controls, piping and site improvements at L Water Treatment Plant. The scope of work includes the demolition of the existing
aqua wsc l improvements project installation of a raw water meter vault, a 0. 5 mg prestressed concrete ground storage tank gst, 1, 500 gpm forced draft aeration fda tower, a gas chlorine feed system and storage building, 1, 500 gpm booster pump station, electrical instrumentation and controls, piping and site improvements at l water treatment plant. the scope of work includes the demolition of the existing pump station and treatment facilities at l water treatment plant site upon the commissioning of the improvements.
Bid Close Date: