Truckee Meadows Water Authority - NV
6th Street Water Main Abandonment - Truckee Meadows Water Authority ( TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the abandonment of 92 linear feet of 6- inch cast iron water main and removal of 14 linear feet of 6- inch transite water main within the project vicinity. Included is the installation of approximately 47 linear feet of new 6- inch restrained ductile iron pipe with vertical offsets, 24" x6" hot tap assembly ( w/TMWA to perform the tap), fitti
Abandonment of 92 linear feet of 6- inch cast iron water main and removal of 14 linear feet of 6- inch transite water main, including installation of approximately 47 linear feet of new 6- inch restrained ductile iron pipe with vertical offsets, 24x6 hot tap assembly, fittings, appurtenances, and surface restoration Abandonment of 92 LF of 6- inch cast iron water main, removal of 14 LF of 6- inch transite water main, installation of 47 LF of 6- inch restrained ductile iron pipe with vertical offsets, 24x6 hot tap assembly, fittings, appurtenances, temporary and permanent pavement patching
Bid Close Date: