Montgomery County Municipal Utility District No. 123
Two Step Farm Phase II WWTP for MCMUD No. 123 The work consists of providing the necessary labor, material, equipment, and supervision to construct Two Step Farm Phase II Wastewater Treatment Plant for Montgomery County Municipal Utility District No. 123. The site work contractor is responsible for all site work, including but not limited to expansion of the capacity of the existing lift station including bypass pumping, demolition and replacement of three ( 3) submersible pumps with all accessories, riser
Two step farm phase II WWTP for MCMUD no. 123 Providing the necessary labor, material, equipment, and supervision to construct two step farm phase II wastewater treatment plant for montgomery county municipal utility district no. 123. The site work contractor is responsible for all site work, including but not limited to expansion of the capacity of the existing lift station including bypass pumping, demolition and replacement of three 3 submersible pumps with all accessories, riser piping, valves, coatings and supports yard piping manhole site work protective coatings, concrete pads a steel elevated headworks structure with manual bar screen and flow splitting weirs, underground piping at train nos. 1, 2 amp 3 480v distribution panelboard 120 240v panelboard lighting contactor panel spd site lighting electrical rack and supports electrical manholes underground duct banks with wires and conduits terminal boxes at aeration basin wires and conduits from the terminal boxes at aeration basin to the electrical rac
Bid Close Date: