Brazoria County Mud No. 90
Wynserra Water Plant - Phase 1 The work includes construction of one ( 1) bolted steel ground storage tank with foundation; one ( 1) hydropneumatic tank including foundation; three ( 3) horizontal split case booster pumps with foundations; installation of one ( 1) 20, 000 gallon hydropneumatic tank including foundationone ( 1) pre- procured natural gas generator with sound attenuated enclosure and ATS, and foundation; CMU control building with foundation; disinfection equipment with chemical injection lines
wynserra water plant phase 1 construction of one 1 bolted steel ground storage tank with foundation, one 1 hydropneumatic tank including foundation, three 3 horizontal split case booster pumps with foundations, installation of one 1 20, 000 gallon hydropneumatic tank including foundation, one 1 pre procured natural gas generator with sound attenuated enclosure and ats, and foundation, cmu control building with foundation, disinfection equipment with chemical injection lines, plant piping, electrical, instruments, and control work including service, protective coatings, concrete pavement, driveway and sidewalks, fence and gate, grading, and drainage, drainage swales, hydro mulch seeding and all additional items shown on the construction plans or needed for a completely functional water plant.
Bid Close Date: