City Of Greenfield - Commbuys
Construction of a poured in placed engineered concrete wall
construction of a poured in placed engineered concrete wall construction of a 168 x 7 x 12 engineered concrete wall anchored on a 168 x 12 x 3 footing. the footing is to be anchored into the existing 6 floor slab inside the greenfield transfer station. also to have a gravel filled 108 x 128 conveyor pit excavated to a depth of 6 and filledpatched with concrete. this patch is to be anchored into the existing 6 floor slab inside the greenfield transfer station.
Bid Close Date: