City Of Friendswood
Blackhawk Boulevard Reconstruction Phase II- Repackage C The Project includes: The replacement of a four- lane curb- and- gutter concrete roadway along Blackhawk Boulevard from FM **** to approximately 500 feet south of Pennystone Way and Thursa Lane to FM 528. This includes pavement, drainage ( 24 & ndash; 42 RCP and 5& rsquo; x3& rsquo; RCB), and 12 PVC water line at locations that is not PVC. This project also includes installation of 24 transmission water main from FM **** to Edenvale Street.
Blackhawk Boulevard Reconstruction Replacement of a four- lane curb and gutter concrete roadway, pavement, drainage, RCP and RCB, water line installation, and transmission water main installation.
Bid Close Date: