City Of Ivanhoe
City of Ivanhoe, TX - Lake Ivanhoe Dam This Project provides for improvements along approximately 200 linear feet of Lake Ivanhoe Dam in the City of Ivanhoe, Texas. The Lake Ivanhoe Dam is an existing earthen dam and construction activities for the improvements will include earthwork, RCP drain installation, reinforced concrete construction, rock rip rap, and other ancillary civil construction activities. The contracted work will include, but not be limited to:( Reference Bid Documents for detailed Scope of
Improvements along approximately 200 linear feet of Lake Ivanhoe Dam in the City of Ivanhoe, Texas. reference bid documents for detailed scope of work mobilizationtraffic control barricades, signs, traffic detours, etc. sw3p preparation, maintenance, and removalconstruction materials testingprepare right of wayproof rollingembankment placement of structural fillsreinforced concrete lake drain intakeinstallation of slide gateinstall 36 diameter reinforced concrete pipe rcp install txdot type ii safety end treatmentconstruct sand filter diaphragmreinforced concrete service spillway w baffle blocksexcavationconstruct proposed outfall ditchre grade existing outfall ditchinstall 12 stone rip rap, with geotextile fabricpermanent seeding
Bid Close Date: