City Of Dacula- GA
Brookton Chase Court and Brookton Downs Subdivision Asphalt Repaving Project - The Work to be completed for this Project consists of furnishing all labor, materials, earthwork, construction operations, details, supervision, and coordination of all trades, utility suppliers, governmental inspections, and approvals to complete the construction, installation, and coordination for the City of Dacula " Brookton Chase Court and Brookton Downs Subdivision Asphalt Repaving Project" as follows: The scope of work for
Asphalt repaving project for Brookton Chase Court and Brookton Downs Subdivision The scope of work for Brookton Chase Court includes performing full depth reclamation FDR which requires milling 312 of existing asphalt and subgrade material then mixing type I Portland cement at a spread rate of 65 lbs/sy. Contractor will then install 2 of 19mm asphalt binder course apply tack coat and then top with 112 of type 2 F mix 9. 5mm surface course asphalt pavement. Contractor shall reestablish crown in center of road when installing pavement to promote positive drainage to existing curb gutter and storm drainage inlets. Existing asphalt cores based on SGC report reveal asphalt thicknesses of 112 to 212. Brookton Downs Subdivision consists of Brookton Drive, Brookton Lane, and Brookton Woods Way. Brookton Drive and Brookton Lane have been repaved multiple times over the years, so asphalt is built up above the gutter line. Existing asphalt cores based on SGC report reveal asphalt thicknesses of 334 to 5. Contractor wil
Bid Close Date: