Sumner-Bonney Lake School District
Lakeridge Middle School Parking and Queuing, Sumner- Bonney Lake School District Bonney Lake, WA
a. site preparation and tesc: preconstruction site inspection utility locates and coordination selective demolition and removals installation, maintenance and removal of temporary erosion and sediment control tesc best management practices bmps and establishment of segregated work areas to maintain uninterrupted vehicular and pedestrian access to existing driveways. b. earthwork: clearing, grubbing, grading, excavation, embankment, compaction, and subgrade preparation within the project limits. c. stormwater management: installation of storm drain piping catch basins, structures, and connections to the existing onsite conveyance system construction of underground stormwater detention and water quality facilities, including modular storage systems, flow control structures, treatment units, and all associated appurtenances. d. electrical and site lighting: removal, protection, relocation, and reinstallation of site electrical and lighting systems as required to accommodate the proposed parking and queuing impro
Bid Close Date: