Kerr County
Phase IV - East Kerr/Center Point Wastewater Collection Project The project includes construction of new wastewater collection system pipelines, service connections, and modifications to existing wastewater infrastructure as follows: Installation of about 900 linear feet of six- inch gravity sewers. Installation of metal canopies at 5 existing lift stations. Installation of sewer service connections to approximately 35 existing structures. Repairing of manhole rings or cones at approximately 12 manholes. I
phase iv east kerr center point wastewater collection project installation of about 900 linear feet of six inch gravity sewers. installation of metal canopies at 5 existing lift stations. installation of sewer service connections to approximately 35 existing structures. repairing of manhole rings or cones at approximately 12 manholes. installation of metal and concrete protections at approximately 210 existing sewer service cleanouts. implementation of an odor control system at an existing lift station. implementation of concrete reinforcement structures at 3 existing manholes.
Bid Close Date: