Pflugerville Community Development Corporation ( Pcdc)
Helios Way Right- in & Right- out Driveway and Impact Way Phase IV Furnishing all labor; material, tools and equipment and performing all work required for the Helios Way Right- In and Right- Out Driveway which consists of increasing the width of the existing pavement from approximately 25 feet to 36 feet and installing a new driveway onto the SH130 frontage road with acceleration and deceleration lanes. Existing 25- foot- wide asphalt on Helios Way will be removed and replaced with 36& rsquo; concrete pave
helios way right in right out driveway and impact way phase iv furnishing all labor material, tools and equipment and performing all work required for the helios way right in and right out driveway which consists of increasing the width of the existing pavement from approximately 25 feet to 36 feet and installing a new driveway onto the sh130 frontage road with acceleration and deceleration lanes. existing 25 foot wide asphalt on helios way will be removed and replaced with 36 rsquo concrete pavement. new curbs, gutters, and storm sewer inlets will be installed along the widened drive including storm sewer extensions from the existing inlet locations to the proposed inlet locations. impact way phase iv consists of approximately 2, 673 linear feet of 12 16 water lines, 977 linear feet of 8 12 wastewater lines, 48 linear feet of 4 rsquo x4 rsquo reinforced concrete box, 708 linear feet of 6 rsquo x4 rsquo reinforced concrete box, 658 linear feet of **** storm sewer, retaining wall structure, 1, 575 linear feet
Bid Close Date: