City Of Garden Ridge
Bat Cave Road Improvements Asphalt overlay and level up for 10, 108 SY of existing roadway and 2, 380 SY of base repair, as designated in the project drawings and described in the contract documents and technical specifications.
bat cave road improvements asphalt overlay and level up for 10, 108 sy of existing roadway and 2, 380 sy of base repair, as designated in the project drawings and described in the contract documents and technical specifications.
Bid Close Date: