Village Of Tinley Park
Post 19 Lift Station Improvements- Post 19 Lift Station Improvements include but not limited to: The types of Work to be performed include but are not limited to the following: A. Furnish and install ( 2) submersible type wastewater pumps in proposed wet well. B. Furnish and install epoxy- coated wet well. C. Furnish and install ductile iron ( DI) discharge piping, fittings, check valves and plug valves in proposed valve vault. D. Furnish and install pump control panel and SCADA system within pump control p
Bid Close Date: