Goliad Tx
TXCDBG 2023- 2024 Water System Improvements for City of Goliad The project consists of the replacement of two ( 2) booster pumps and motors at the San Patricio Water Plant ( WP), one ( 1) booster pump and motor and one ( 1) motor at the Chilton WP, and replacement of the San Patricio Well Pump Motor. Additional work includes replacement of the chlorine cylinder scales at both sites and replacement of the 1 HP chlorine injection pump at Chilton. Electrical modifications are required for replacement of the ex
water system improvements replacement of two 2 booster pumps and motors, one 1 booster pump and motor and one 1 motor, replacement of the san patricio well pump motor, replacement of the chlorine cylinder scales, replacement of the 1 hp chlorine injection pump, electrical modifications, replacement of the perimeter fence, blasting and re coating of the above ground piping
Bid Close Date: