Grayhawk Association Of Homeowners
Grayhawk Community Slope Remediation & Pond Dredging The project consists of: Removing a concrete retaining wallCutting and plugging the existing irrigation systemRemoving concrete sidewalksRemoving boulders, piers, trees and miscellaneous items from the slope inside the roundaboutInstalling a cast- in- place concrete retaining wall including stone veneerInstalling a metal handrail on top of the retaining wallInstalling concrete mow strip adjacent to the retaining wallInstalling solid block Bermuda sod in a
grayhawk community slope remediation pond dredging base bid there are two bid alternates for additional slope removaldredging 3 ponds and removing the sediment from the site bid alternatesthere are three bid alternates for dredging these three ponds