Milwaukee Metropolitan Sewerage District
Oak Creek Southwest MIS Extension- The project consists of the installation of a new metropolitan interceptor sewer ( MIS) from the end of the existing MIS at W. Oakwood Rd. south to the Racine county line by microtunneling. The contractor will construct: Approximately 5, 242 feet of 24- inch sewer to be installed within a casing pipe installed by microtunneling Approximately 20 feet of 24- inch sewer will be installed by an alternate trenchless method as specified in Section ****, TUNNEL EXCAVATION and as
Bid Close Date: