City Of Victorville - CA
Annual Maintenance for Pond 14
Annual maintenance of percolation pond 14 Removal of 12 feet of accumulated sediment, vegetation, and compacted material from pond basin; placement of spoils on pond side; ripping entire pond basin surface from bank to bank at depth of 6- 8 inches
Bid Close Date: