Town Of Bostic
OLD SUNSHINE ROAD WATER SYSTEM UPGRADES, STORMWATER SYSTEM UPGRADES & METER SYSTEM REPLACEMENT- The project generally consists of: the replacement of approximately 2, 800 linear feet of new 8- inch ductile iron pipe water line, valves, hydrants and other associated appurtenances. The replacement and installation of 6 PVC, 18 , 24 and 36 RCP/HDPE stormwater collection pipes including the installation of catch basins and other associated appurtenances. The replacement of all existing water meters within the
Bid Close Date: