Hallmark Development
Stillwater Cove Mass Grading, Detention, Water, Drainage and Paving Stillwater Cove Mass Grading, Detention, Water, Drainage and PavingMajor items of construction and services required are designated as follows: Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; Repair existing pavement affected; Construct and adjust storm sewer, manholes, and appurtenances; Construct roadside ditches, perimeter ditches, and detention pond; Construct roadway pavement; Furnish a
Mass grading, detention, water, drainage, and paving construction Lot 1: Installation and adjustment of waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances. Lot 2: Repair of existing pavement. Lot 3: Construction and adjustment of storm sewer, manholes, and appurtenances. Lot 4: Construction of roadside ditches, perimeter ditches, and detention pond. Lot 5: Construction of roadway pavement. Lot 6: Furnishing and installation of all subsidiary items to complete the project. Lot 7: Performance of testing on installed lines. Lot 8: Cleanup of the project area upon completion.
Bid Close Date: