Dot - Department Of Transportation - ND
Structure removal & replacement, grading, aggregate surfacing, temporary bypass and incidentals
Structure removal and replacement, grading, aggregate surfacing, temporary bypass, and incidentals 1. Contract Bond ( Lump Sum) 2. Clearing and Grubbing ( Lump Sum) 3. Removal of Structure ( Each) 4. Remove Existing Fence ( Linear Foot) 5. Removal of Temporary Bypass ( Each) 6. Common Excavation Type B ( Cubic Yard) 7. Topsoil ( Cubic Yard) 8. Borrow Excavation ( Cubic Yard) 9. Box Culvert Excavation ( Each) 10. Channel Excavation ( Lump Sum) 11. Foundation Fill ( Ton) 12. Box Culvert Foundation Aggregate ( Cubic Yard) 13. Foundation Preparation Box Culvert ( Each) 14. Water ( Million Gallons) 15. Seeding Class II ( Acre) 16. Wetland Seed ( Acre) 17. Temporary Cover Crop ( Acre) 18. Straw Mulch ( Acre) 19. Riprap Grade II ( Cubic Yard) 20. Silt Fence ( Linear Foot) 21. Remove Silt Fence ( Linear Foot) 22. Fiber Rolls 12in ( Linear Foot) 23. Remove Fiber Rolls 12in ( Linear Foot) 24. Flotation Silt Curtain ( Linear Foot) 25. Remove Flotation Silt Curtain ( Linear Foot) 26. Aggregate Surface Course Cl 13 ( Ton)
Bid Close Date: