USA | IL | COOK COUNTY | HOFFMAN ESTATES | 60169
Small City
He Parks - Hoffman Estates Park District - IL
Seascape Family Aquatic Center ( SFAC) Sand Filters
Renovation of existing pool filtration systems at Seascape Family Aquatic Center Pool mechanical systems including piping, circulation pump and filter, miscellaneous pool testing, safety and control equipment, pool startup, closing and instruction of owners personnel, regenerative media filter tanks, flexible tube filter elements, bump mechanism, vacuum transfer system, sight glass, pressure gauge panel, inspection viewing window, valves, automatic regeneration controller, circulation pumps, strainers, variable frequency drives, flow meters, air compressor, pneumatic actuators, solenoid valves, butterfly valves, ball valves, check valves, modulating float valves, media ( expanded perlite), piping materials, hangers and supports
AI helper
Renovation of existing pool filtration systems at Seascape Family Aquatic Center. Contractor must provide all labor and materials for complete filtration and recirculation systems for lap and activity pools. Work includes installation of regenerative media filters, pumps, VFDs, piping, valves, and related equipment. Contractor must have at least 5 years of experience in similar projects. Submittals required for approval before fabrication. One-year warranty on workmanship and materials, 15-year warranty on filter tank. Piping must be tested per Illinois plumbing code. Water treatment and balancing required before pool turnover. Owner personnel instruction required for at least 4 hours.
Provide one 1 year warranty covering all pool workmanship, material and equipment. Filter tank shall have a fifteen 15 year warranty. filter tank shall have a fifteen 15 year warranty.
Contractor must have a proven record of competence and experience in construction of similar facilities for not less than 5 years. work of this section shall be performed by a contractor who has a proven record of competence and experience in the construction of similar facilities of this size and complexity for not less than 5 years.