Dr Horton
Prairie Lakes Phase 4 Scope of Work of the Contract Documents includes the following: Water piping, including 8 and 16 PVC pipe and appurtenances; Gravity wastewater piping consisting of 8 and 12 PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18- 60 RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
prairie lakes phase 4 scope of work water piping, including 8 and 16 pvc pipe and appurtenances gravity wastewater piping consisting of 8 and 12 pvc pipe, manholes, and appurtenances drainage piping, including approximately 18 60 rcp, inlets, manholes, headwalls and appurtenances excavation, embankment, and paving detention ponds, outfall structures, grading and revegetation sedimentation and erosion control and various other site improvements
Bid Close Date: