Lot 1: Pre and post construction video
Lot 2: Sediment and erosion control
Lot 3: Clearing and grubbing
Lot 4: Trench excavation and backfill - 0' to 10'
Lot 5: Boring - pipe ( 8- inch)
Lot 6: Boring - casing ( 8- inch carrier pipe)
Lot 7: 8" x6" dip tee ( poly wrapped)
Lot 8: 8" dip **** Bend ( poly wrapped)
Lot 9: 8" dip 45? Bend ( poly wrapped)
Lot 10: 6" dip 90? Bend ( poly wrapped)
Lot 11: 8" dip 90? Bend ( poly wrapped)
Lot 12: 8" x6" DIP REDUCER ( POLY WRAPPED)
Lot 13: Single short service ( 1- inch)
Lot 14: Single long service ( 1- inch)
Lot 15: Meter relocation ( 1- inch)
Lot 16: Fire hydrant
Lot 17: Removal of fire hydrant
Lot 18: 6" gate valve and valve box
Lot 19: 8" gate valve and valve box
Lot 20: 6" tapping valve and valve box
Lot 21: 8" tapping valve and valve box
Lot 22: 6" insert- a- valve and valve box
Lot 23: 8" insert- a- valve and valve box
Lot 24: Hydrostatic pressure testing and disinfection
Lot 25: 6" c900 pvc water line pipe ( dr- 14)
Lot 26: 8" c900 pvc water line pipe ( dr- 14)
Lot 27: Steel casing pipe ( 8- inch carrier)
Lot 28: 6" x6" tapping sleeve
Lot 29: 8" x8" tapping sleeve
Lot 30: Construction staking ( construction survey)
Lot 31: Construction signing and traffic control
Lot 32: Mobilization
Lot 33: Pavement cut and permanent repair ( concrete)
Lot 34: Pavement cut and permanent repair ( asphalt)
Lot 35: Drive cut and permanent repair ( concrete)
Lot 36: Remove and replace sidewalk ( 4")
Lot 37: Curb ramp ( 4")
Lot 38: Tactile warning device
Lot 39: Remove and replace curb and gutter
Lot 40: Solid slab sodding
Lot 41: Clsm ( flowable fill)