Bell Tx
Lake Belton WTP Expansion and Improvements Project - Bid Package 8 Plant 3 Construction Work Package 8 for the Lake Belton Water Treatment Plant Expansion and Improvement Project includes but is not limited to the following. Construction for Plant 3, including civil site work ( excavation, aggregate base courses, asphalt paving, and chain- link fencing), structural work ( rapid mix basins, flocculation basins, and a metering vault), mechanical work ( vertical shaft flocculators, inclined plate settlers, a h
lake belton wtp expansion and improvements project bid package 8 plant 3 construction work construction for plant 3, including civil site work excavation, aggregate base courses, asphalt paving, and chain link fencing, structural work rapid mix basins, flocculation basins, and a metering vault, mechanical work vertical shaft flocculators, inclined plate settlers, a hose less cable vacuum driven sludge collector system, and associated utility piping. electrical demolition and electrical amp instrumentation scope is included in the drawing set for reference and coordination but is not included in bid package 8 including removals as required, plus low and medium voltage distribution such as pad mounted transformers, switchgear, mccs, and process control cabling to be performed under and coordinated through the cmar and with the bid package 6 electrical contractor.
Bid Close Date: