Plum Creek Water Reclamation Authority
Laboratory fume hood Project includes the demo of an existing 6 39; laminar flow hood and installation of a 6 39; exhaust fume hood. Preference is to have the hood procured by the installer. Hood must meet the following general requirements:- 6 39; ducted fume hood, including work surface, flow monitor, 2 electrical outlets. Current infrastructure can support water and vacuum depending on cost. - 6 39; base storage cabinet- Exhaust blower - Must be able to meet ANSI specs of 80- 120 fpm
Bid Close Date: