Dept Of Defense- Dept Of The Air Force- Fa2543 460 Cons
Buckley SFB - Cooling Infrastructure Repair Parts - The 460th Civil Engineering Squadron, Buckley SFB, requires various carbon steel pipe repair clamps from 3& quot; to 10& quot;, a pipe freezing kit for pipes ranging from 3& quot; to 10& quot;, and a carbon fiber composite reinforcement package for pi
Repair parts for cooling infrastructure Item ****: Elbow and pipe repair package ( carbon steel pipe repair clamps for 3 to 10 pipes, rated to 80 psi, epoxy coated or with neoprene sheet, compliant with ASME PCC2, ISO ****, ASME B13). Item ****: Pipe freezing kit ( utilizes CO2 or LN2 to freeze water, capable of forming dry ice at - 109 F or colder, for pipes 3/8 to 10 diameter, includes hoses, adapters, timing boards, compliant with ASME PCC2, ISO ****, ASME B13). Item ****: Carbon fiber composite reinforcement package ( field- saturated system with carbon fiber cloth, epoxy, filler material, surface preparation equipment, for sealing leaks in steel pipes 3 to 10 diameter, effective at continuous temperatures up to 200 F, cured ply thickness at least **** inches, compliant with ASME PCC2, ISO ****, ASME B13).
Bid Close Date: